PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued laying out block at Bathrooms 133-136 Facing South.jpg Copper piping at the 3rd floor Facing South-West.jpg Installed cmu block at the 1st floor detention cells Facing North-West.jpg Installing copper piping at the 2nd floor bathroom sinks Facing West.jpg Paching Inside Elevator 1,2,3 shear walls Facing West.jpg pour concrete at Elevator 1,2,3 pocket 2nd floor Facing East.jpg Sprinkler piping at Stair -4 Facing North 2.jpg Sprinkler piping at Stair -4 Facing North.jpg VAV boxes at the 4th floor Facing South.jpg
Previous pageNext page Paching Inside Elevator 1,2,3 shear walls Facing West
Paching Inside Elevator 1,2,3 shear walls Facing West